Description
### Status Check and Work Completion Overview
#### Status of Work:
1. Completed O. K
#### House Finishing Work Descriptions:
- **Locks & Handles:** A+ Category
- **Door Stoppers:** A+ Category
- **Ceiling Mirror:** Ghani Glass (Foyer Area)
- **Washrooms:** Sensor lights + Defrost mirrors (A+ Categories)
- **Kitchen Upper Cabinets + 1 Washroom:** A+ glass with lights
- **Bathroom Vanities:** Waterproof material used in 3 bathrooms
- **External Structure Paint:** ICI Weather Shield
- **Internal Structure Paint:** ICI Emulsion
- **Kitchen Opening Cabinets:** Blum Hardware (Horizontal)
- **Ground Floor Washrooms:** Hot and Cold water for Muslim Shower
- **Washroom Commodes:** Porta
- **Roof Top + Parapit Wall + Car Porch Roof:** Sunny Grey Marble
- **G. F Drawing Room Area:** Wooden Floor
- **Rooms and Other Areas:** UPVC Skirting
- **Wardrobes + Hardware:** A+ Category
- **Attached Bathrooms:** Boravit + Porta Bowls
- **Water Pump:** Espa 0.7 HP (OHWT)
- **External Plumbing:** G. I Fittings
- **Solar + UPS Wiring:** Installed
- **Earthing Work:** 50 feet deep hole in lawn area
- **Switches/Sockets:** Prime / Orange
- **House Lighting:** Fast Company SMDs
- **External Wall Lights:** A+ categories
- **Bathrooms + Powder Area Sanitary:** Grohe
- **Spot Lights:** A+ Categories
- **Main Door:** Company Fabricated Wrought Iron
- **Wrought Iron Work:** Deco Polish with all necessary pre-polish treatment
- **Ceiling:** POP 15 mm thick sheets hanging with Copper Wires
- **House Wiring:** Fast Cable
- **Breakers in DBs:** Schneider Original
- **Entrance + Planters Area Granite:** Seredinia Italian Imported
- **Doors:** Muhagni Wood for Leafs + Basic Structures
- **Wood Doors Hardware:** A+ Category
- **Windows:** Aluminium 1.6 Pak Altech, Ghani / Tariq Glass, Khaas Hardware
- **Main Entrance Door:** Company Fabricated Wrought Iron
- **Railing:** Company Fabricated Wrought Iron
- **Tanks:** Terrace, Overhead Tank, UG Tank, and Septic Tank
- **Materials and Colors:** Selected by Interior Designer
- **Tiles:** Kale, S, Abdullah and Dura Tiles
- **Window Sill + Stairs Granite:** Dark Emprador Imported
- **Bathroom Waterproofing:** Ultra & Sika Chemical (2 times
---
### Summary of Completed Work:
- All tasks listed from 1 to 72 (except 12 and 73) have been completed.
- Extensive use of high-quality materials and finishes as described in the detailed list.
- Pending work: Task 12 and Task 73.
This detailed breakdown should provide a comprehensive overview of the status and quality of the finishing work completed in the house. If you need further clarification or additional details, feel free to ask!